Modern canal house | Amsterdam
In 2016, a central vacuum cleaning system from BEAM Electrolux was delivered to this new-build home in Amsterdam. The pipe system is 32 meters long in total and the user has five vacuum cleaner contacts on four floors.
Project description | |
---|---|
Situation | New construction |
Application | Central vacuum system |
Location | Amsterdam, The Netherlands |
Floor area | 210 m2 |
Piping system | 32 meter |
Completion | 2016 |